A new version is available.

We've updated our website. Please click the button to download the new version.

Download now

A hydroelectric power plant holds its breath (Swiss Press Video 2016, by Maurus Spahni) - Swiss Press Award

TeleBärn

Video
2016

Maurus Spahni

Every two years, Bern's Felsenau hydroelectric power plant is dewatered. The 500-meter-long tunnel and turbines are shut down. The entire facility is inspected for damage. This provides an exclusive insight into a world that is otherwise powered by 100 cubic meters of water per second. A VJ piece produced during the day for the 6:00 PM news on TeleBärn.

Author